+86-555-8323386
Search
enLanguage

Operation Essentials for Special Vehicle Loading

Nov 17, 2022

1. Before loading, one feed port is opened and the other feed port is closed;

2. Close the unloading disc valve and the external air source interface;

3. Open the exhaust valve;

4. Choose one of the bins to load, and after loading one bin, close the inlet of the bin;

5. Open the feed port of another warehouse and load it;

6. After the filling of the two warehouses is completed, close the exhaust valve and the feeding port;

7. Tighten the feed port.


Send Inquiry