1. Before starting, all parts of the mechanical system should be carefully inspected, and the machine can only be started after it is confirmed to be good.
2. Before starting, put the stirring lever in the "neutral" position.
3. After starting, put the stirring control lever in the "discharging" position, and drain the accumulated water in the cylinder.
4. When loading, the stirring lever should be placed in the "loading" position.
5. Before transportation, the unloading chute must be fixed in the "driving" position to prevent swinging.
6. When operating the joystick, it should stay in the "neutral" position for a while before moving to the next position.
7. Do a good job in civilized construction, and the excess materials in the barrel are not allowed to be dumped casually. After unloading, the mixing drum, trough, idler and other parts must be cleaned.
8. When people enter the cylinder to remove concrete agglomerates, the vehicle should be turned off, the electric door key should be pulled out, and the outside of the cylinder should be monitored by personnel.